CORC

浏览/检索结果: 共3条,第1-3条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
The single-manufacturer single-retailer integrated production-delivery lot sizing model with production capacity under stochastic lead time demand 会议论文
11th CIRP Conference on Industrial Product-Service Systems, CIRP IPS2 2019, Zhuhai, China, 2019-05-29
作者:  Sun, Xuefang;  Zhang, Renqian
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/30
Modeling and solving the constrained multi-items lot-sizing problem with time-varying setup cost 期刊论文
CHAOS SOLITONS & FRACTALS, 2018, 卷号: 116, 页码: 202-207
作者:  Zhou, Shenghan;  Zhou, Yuliang;  Zuo, Xiaorong;  Xiao, Yiyong;  Cheng, Yang
收藏  |  浏览/下载:1/0  |  提交时间:2019/12/30
Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time 期刊论文
MATHEMATICAL PROBLEMS IN ENGINEERING, 2018
作者:  Zhang, Renqian;  Sun, Xuefang
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/30


©版权所有 ©2017 CSpace - Powered by CSpace