CORC  > 北京航空航天大学
Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time
Zhang, Renqian; Sun, Xuefang
刊名MATHEMATICAL PROBLEMS IN ENGINEERING
2018
ISSN号1024-123X
DOI10.1155/2018/1569029
URL标识查看原文
收录类别SCIE ; SSCI
WOS记录号WOS:000431230400001
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/5933155
专题北京航空航天大学
推荐引用方式
GB/T 7714
Zhang, Renqian,Sun, Xuefang. Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time[J]. MATHEMATICAL PROBLEMS IN ENGINEERING,2018.
APA Zhang, Renqian,&Sun, Xuefang.(2018).Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time.MATHEMATICAL PROBLEMS IN ENGINEERING.
MLA Zhang, Renqian,et al."Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time".MATHEMATICAL PROBLEMS IN ENGINEERING (2018).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace