Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time | |
Zhang, Renqian; Sun, Xuefang | |
刊名 | MATHEMATICAL PROBLEMS IN ENGINEERING |
2018 | |
ISSN号 | 1024-123X |
DOI | 10.1155/2018/1569029 |
URL标识 | 查看原文 |
收录类别 | SCIE ; SSCI |
WOS记录号 | WOS:000431230400001 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/5933155 |
专题 | 北京航空航天大学 |
推荐引用方式 GB/T 7714 | Zhang, Renqian,Sun, Xuefang. Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time[J]. MATHEMATICAL PROBLEMS IN ENGINEERING,2018. |
APA | Zhang, Renqian,&Sun, Xuefang.(2018).Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time.MATHEMATICAL PROBLEMS IN ENGINEERING. |
MLA | Zhang, Renqian,et al."Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time".MATHEMATICAL PROBLEMS IN ENGINEERING (2018). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论