CORC

浏览/检索结果: 共11条,第1-10条 帮助

已选(0)清除 条数/页:   排序方式:
Safe distance between debrining tubing inlet and sediment in a gas storage salt cavern 期刊论文
JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2021, 卷号: 196, 页码: 12
作者:  Wang, Tongtao;  Chai, Guoxing;  Cen, Xueqi;  Yang, Jie;  Daemen, J. J. K.
收藏  |  浏览/下载:46/0  |  提交时间:2021/05/25
节能减排补贴政策下的企业与政府信号博弈模型 期刊论文
中国管理科学, 2013, 卷号: 21, 期号: 4, 页码: 6-10
作者:  张国兴;  张绪涛;  程素杰;  柴国荣;  王龙龙
收藏  |  浏览/下载:0/0  |  提交时间:2015/04/14
基于模块化外包的项目调度问题研究--以三峡工程TCP/C1-3-1A-1项目为例 期刊论文
运筹与管理, 2013, 期号: 3, 页码: 109-114
作者:  柴国荣;  薄银利;  宗胜亮;  何正文;  张国兴
收藏  |  浏览/下载:0/0  |  提交时间:2015/04/14
Calculation of the cycle and working hours for complex projects with iterations 会议论文
2011 International Conference on Information Technology, Computer Engineering and Management Sciences, ICM 2011, Nanjing, Jiangsu, China, September 24, 2011 - September 25, 2011
作者:  Chai, Guo Rong;  Du, Zhi Kun;  Zhang, Guoxing;  Su, Yana
收藏  |  浏览/下载:0/0  |  提交时间:2017/01/18
Calculation of the cycle and working hours for complex projects with iterations 会议论文
Nanjing, Jiangsu, China, September 24, 2011 - September 25, 2011
作者:  Chai, Guo Rong;  Du, Zhi Kun;  Zhang, Guoxing;  Su, Yana
收藏  |  浏览/下载:0/0  |  提交时间:2020/11/15
Optimization of bonus-penalty structure in flexible resources-constrained project scheduling problems from both sides of the contract 会议论文
3rd International Conference on Business Intelligence and Financial Engineering, BIFE 2010, Hong Kong, China, August 13, 2010 - August 15, 2010
作者:  Chai, Guorong;  Huang, Shitao;  Zhang, Guoxing;  Su, Yana
收藏  |  浏览/下载:0/0  |  提交时间:2017/01/18
Non-competition guarantee value model research based on real option 会议论文
3rd International Conference on Business Intelligence and Financial Engineering, BIFE 2010, Hong Kong, China, August 13, 2010 - August 15, 2010
作者:  Zhang, Guoxing;  Chai, Guorong;  Guo, Ju-E;  Wang, Peng;  Xue, Yong
收藏  |  浏览/下载:0/0  |  提交时间:2017/01/18
Non-competition guarantee value model research based on real option 会议论文
作者:  Zhang, Guoxing;  Chai, Guorong;  Guo, Ju-E;  Wang, Peng;  Xue, Yong
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/10
Using jump-diffusion modeling for valuing real options in infrastructure projects 期刊论文
FRONTIERS OF COMPUTER SCIENCE IN CHINA, 2010, 卷号: 4, 期号: 2, 页码: 263-270
作者:  Zhang, Guoxing;  Guo, Ju'e;  Chai, Guorong;  Gong, Li;  Wang, Xuejun
收藏  |  浏览/下载:8/0  |  提交时间:2019/12/18
Optimization of bonus-penalty structure in flexible resources-constrained project scheduling problems from both sides of the contract 会议论文
作者:  Chai, Guorong;  Huang, Shitao;  Zhang, Guoxing;  Su, Yana
收藏  |  浏览/下载:1/0  |  提交时间:2020/11/15


©版权所有 ©2017 CSpace - Powered by CSpace