CORC

浏览/检索结果: 共150条,第1-10条 帮助

已选(0)清除 条数/页:   排序方式:
A knowledge-driven constructive heuristic algorithm for the distributed assembly blocking flow shop scheduling problem 期刊论文
Expert Systems with Applications, 2022, 卷号: 202
作者:  Yang, Yahong;  Li, Xun
收藏  |  浏览/下载:24/0  |  提交时间:2022/06/20
A reinforcement learning-driven brain storm optimisation algorithm for multi-objective energy-efficient distributed assembly no-wait flow shop scheduling problem 期刊论文
International Journal of Production Research, 2022
作者:  Zhao, Fuqing;  Hu, Xiaotong;  Wang, Ling;  Xu, Tianpeng;  Zhu, Ningning
收藏  |  浏览/下载:25/0  |  提交时间:2022/07/20
An optimal block knowledge driven backtracking search algorithm for distributed assembly No-wait flow shop scheduling problem 期刊论文
Applied Soft Computing, 2021, 卷号: 112
作者:  Zhao, Fuqing;  Zhao, Jinlong;  Wang, Ling;  Tang, Jianxin
收藏  |  浏览/下载:13/0  |  提交时间:2022/02/17
A Fast Circuit Scheduling Scheme for Optical Data Center Networks 期刊论文
IEEE PHOTONICS TECHNOLOGY LETTERS, 2021, 卷号: 33, 期号: 11, 页码: 561-564
作者:  Yu, Xiaoshan;  Gu, Huaxi;  Li, Shuo;  Lu, Yunfeng
收藏  |  浏览/下载:30/0  |  提交时间:2021/12/01
A cooperative water wave optimization algorithm with reinforcement learning for the distributed assembly no-idle flowshop scheduling problem 期刊论文
Computers and Industrial Engineering, 2021, 卷号: 153
作者:  Zhao, Fuqing;  Zhang, Lixin;  Cao, Jie;  Tang, Jianxin
收藏  |  浏览/下载:14/0  |  提交时间:2021/03/02
Task Scheduling for Multi-Cloud Computing Subject to Security and Reliability Constraints 期刊论文
IEEE/CAA Journal of Automatica Sinica, 2021, 卷号: 8, 期号: 4, 页码: 848-865
作者:  Qing-Hua Zhu;  Huan Tang;  Jia-Jie Huang;  Yan Hou
收藏  |  浏览/下载:24/0  |  提交时间:2021/04/09
A Self-Learning Discrete Jaya Algorithm for Multiobjective Energy-Efficient Distributed No-Idle Flow-Shop Scheduling Problem in Heterogeneous Factory System 期刊论文
IEEE TRANSACTIONS ON CYBERNETICS, 2021
作者:  Zhao, Fuqing;  Ma, Ru;  Wang, Ling
收藏  |  浏览/下载:12/0  |  提交时间:2022/03/01
Bus manufacturing workshop scheduling method with routing buffer 期刊论文
International Journal of Simulation and Process Modelling, 2020, 卷号: 15, 期号: 3, 页码: 225-235
作者:  Han ZH(韩忠华);  Zhang JY(张竞元);  Wang, Shiyao;  Qi, Yuanwei
收藏  |  浏览/下载:2/0  |  提交时间:2020/06/21
Resource Leveling in Projects with Stochastic Minimum Time Lags 期刊论文
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 卷号: 145, 期号: 4
作者:  Li, Hongbo;  Wang, Meng;  Dong, Xuebing
收藏  |  浏览/下载:19/0  |  提交时间:2019/08/22
Scenario-based heuristic to two-stage stochastic program for the parallel machine ScheLoc problem 期刊论文
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 卷号: 57, 期号: 6, 页码: 1706-1723
作者:  Liu, Ming;  Liu, Xin;  Zhang, E.;  Chu, Feng;  Chu, Chengbin
收藏  |  浏览/下载:20/0  |  提交时间:2019/08/22


©版权所有 ©2017 CSpace - Powered by CSpace