×
验证码:
换一张
忘记密码?
记住我
CORC
首页
科研机构
检索
知识图谱
申请加入
托管服务
登录
注册
在结果中检索
科研机构
兰州理工大学 [4]
华南理工大学 [2]
内容类型
期刊论文 [3]
会议论文 [2]
会议 [1]
发表日期
2016 [1]
2014 [1]
2013 [1]
2011 [1]
×
知识图谱
CORC
开始提交
已提交作品
待认领作品
已认领作品
未提交全文
收藏管理
QQ客服
官方微博
反馈留言
浏览/检索结果:
共6条,第1-6条
帮助
已选(
0
)
清除
条数/页:
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
排序方式:
请选择
作者升序
作者降序
题名升序
题名降序
发表日期升序
发表日期降序
提交时间升序
提交时间降序
Modelling and optimising of ready-mixed concrete vehicle scheduling problem with stochastic transportation time
期刊论文
International Journal of Wireless and Mobile Computing, 2016, 卷号: 10, 期号: 2, 页码: 104-111
作者:
Zhang, Guo-Chen
;
Zeng, Jian-Chao
;
Zhang, Jian-Hua
收藏
  |  
浏览/下载:33/0
  |  
提交时间:2020/11/14
Computer programming
Concrete mixers
Genetic algorithms
Hash functions
Scheduling
Scheduling algorithms
Stochastic systems
Vehicles
Chance-constrained programming model
Heuristic strategy
Ready mixed concrete (RMC)
Search strategies
Stochastic transportation
Transportation time
Vehicle scheduling
Vehicle scheduling problem
Ready-mixed concrete vehicle rescheduling method based on the internet of things
期刊论文
Sensor Letters, 2014, 卷号: 12, 期号: 2, 页码: 431-438
作者:
Zhang, Guochen
;
Zeng, Jianchao
收藏
  |  
浏览/下载:31/0
  |  
提交时间:2020/11/14
Accidents
Computer simulation
Concrete mixers
Concrete mixing
Fleet operations
Heuristic algorithms
Hybrid vehicles
Internet of Things
Optimization
Scheduling
Dynamic variations
Environmental variations
Hybrid heuristic algorithms
Intelligent monitoring
Management technologies
Operating condition
Rescheduling strategy
System structures
Modelling and solving for ready-mixed concrete scheduling problems with time dependence
期刊论文
International Journal of Computing Science and Mathematics, 2013, 卷号: 4, 期号: 2, 页码: 163-175
作者:
Zhang, Guo-Chen
;
Zeng, Jian-Chao
收藏
  |  
浏览/下载:29/0
  |  
提交时间:2020/11/14
Concrete mixers
Construction industry
Heuristic methods
Learning algorithms
Local search (optimization)
Ready mixed concrete
Scheduling
Travel time
Additional costs
Construction companies
Construction sites
Heuristic approach
Industrial datum
Local search algorithm
Scheduling problem
Time dependence
The parameter assessment for concrete mixing slag powder performance of anti-sulfate erosion
会议论文
Harbin, China, August 6, 2011 - August 6, 2011
作者:
Qiao, Hongxia
;
Yu, Hongfa
;
He, Zhongmao
收藏
  |  
浏览/下载:12/0
  |  
提交时间:2020/11/15
Building materials
Concrete mixers
Construction equipment
Deterioration
Energy conservation
Erosion
Rating
Slags
Assessment parameter
Concrete performance
Performance deterioration
Slag powder
Sulfate erosion
Integrated scheduling in ready mixed concrete plant with multi-mixer (EI收录)
会议
Barcelona, Spain,
作者:
Zhang, Yakun[1]
;
Guo, Hua[2]
收藏
  |  
浏览/下载:2/0
  |  
提交时间:2019/04/11
Concrete mixers
Concretes
Information science
Mixers (machinery)
Scheduling
A life cycle impacts assessment of the differences between the LNG cement mixer truck and its diesel counterpart (EI收录)
会议论文
Applied Mechanics and Materials, Macao, China, May 20, 2014 - May 21, 2014
作者:
Yin, Ren-Shu[1]
;
Yang, Yan-Ping[1]
;
Xu, Jian-Quan[1,2]
;
Chen, Yi-Song[1]
;
Tu, Xiao-Yue[1]
收藏
  |  
浏览/下载:1/0
  |  
提交时间:2019/04/12
Concrete mixers
Life cycle
Natural gas transportation
Truck transportation
Trucks
©版权所有 ©2017 CSpace - Powered by
CSpace