CORC

浏览/检索结果: 共4条,第1-4条 帮助

限定条件                    
已选(0)清除 条数/页:   排序方式:
An MILP Model for Short-term Peak Shaving Operation of Cascaded Hydropower Plants Considering Unit Commitment 会议论文
2018 IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2018 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE), 2018-01-01
作者:  Su, Chengguo;  Cheng, Chuntian;  Wang, Peilin
收藏  |  浏览/下载:60/0  |  提交时间:2019/12/02
An optimization model for carbon capture utilization and storage supply chain: A case study in Northeastern China 期刊论文
APPLIED ENERGY, 2018, 卷号: 231, 页码: 194-206
作者:  Zhang, Shuai;  Liu, Linlin;  Zhang, Lei;  Zhuang, Yu;  Du, Jian
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/02
An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants serving multiple power grids 期刊论文
ENERGY, 2018, 卷号: 163, 页码: 722-733
作者:  Cheng, Chuntian;  Su, Chengguo;  Wang, Peilin;  Shen, Jianjian;  Lu, Jianyu
收藏  |  浏览/下载:16/0  |  提交时间:2019/12/02
Optimal allocation of hydropower and hybrid electricity injected from inter-regional transmission lines among multiple receiving-end power grids in China 期刊论文
ENERGY, 2018, 卷号: 162, 页码: 444-452
作者:  Feng, Zhong-kai;  Niu, Wen-jing;  Cheng, Chun-tian
收藏  |  浏览/下载:2/0  |  提交时间:2019/12/02


©版权所有 ©2017 CSpace - Powered by CSpace