CORC

浏览/检索结果: 共5条,第1-5条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
Energy-Efficient 50+Gb/s VCSELs for 200+Gb/s Optical Interconnects 期刊论文
Ieee Journal of Selected Topics in Quantum Electronics, 2019, 卷号: 25, 期号: 6, 页码: 5
作者:  G.Larisch;  R.Rosales;  D.Bimberg
收藏  |  浏览/下载:1/0  |  提交时间:2020/08/24
微纳光通信器件与系统 成果
吉林省技术发明奖: 三等奖, 2014
梁静秋; 王维彪; 梁中翥; 秦余欣; 田超; 崔乃迪; 吕金光; 陈松
收藏  |  浏览/下载:118/0  |  提交时间:2015/02/12
用于波长信道选择器的微型电磁光开关研究 学位论文
硕士, 长春光学精密机械与物理所: 中国科学院长春光学精密机械与物理所, 2008
钟砚超
收藏  |  浏览/下载:22/0  |  提交时间:2012/03/21
聚酰亚胺悬臂MOEMS电磁光开关研究 学位论文
长春光学精密机械与物理所: 中国科学院长春光学精密机械与物理所, 2007
作者:  孔庆峰
收藏  |  浏览/下载:6/0  |  提交时间:2012/03/21
The replacement of dry heat in generic reliability assurance requirements for passive optical components (EI CONFERENCE) 会议论文
ICO20: Optical Devices and Instruments, August 21, 2005 - August 26, 2005, Changchun, China
Ren X.; Qian L.; Zhang G.
收藏  |  浏览/下载:11/0  |  提交时间:2013/03/25
According to Generic Reliability Assurance Requirements for Passive Optical Components GR-1221-CORE (Issue 2  January 1999)  reliability determination test of different kinds of passive optical components which using in uncontrolled environments is taken. The test condition of High Temperature Storage Test (Dry Test) and Damp Test is in below sheet. Except for humidity condition  all is same. In order to save test time and cost  after a sires of contrast tests  the replacement of Dry Heat is discussed. Controlling the Failure mechanism of dry heat and damp heat of passive optical components  the contrast test of dry heat and damp heat for passive optical components (include DWDM  CWDM  Coupler  Isolator  mini Isolator) is taken. The test result of isolator is listed. Telcordia test not only test the reliability of the passive optical components  but also test the patience of the experimenter. The cost of Telcordia test in money  manpower and material resources  especially in time is heavy burden for the company. After a series of tests  we can find that Damp heat could factually test the reliability of passive optical components  and equipment manufacturer in accord with component manufacture could omit the dry heat test if damp heat test is taken first and passed.  


©版权所有 ©2017 CSpace - Powered by CSpace