CORC

浏览/检索结果: 共14条,第1-10条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
Lightning flash algorithm for solving non-convex combined emission economic dispatch with generator constraints 期刊论文
IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 卷号: 12, 页码: 104-116
作者:  Kheshti, Mostafa;  Kang, Xiaoning;  Li, Jiangtao;  Regulski, Pawel;  Terzija, Vladimir
收藏  |  浏览/下载:50/0  |  提交时间:2019/11/19
Optimal stochastic scheduling of thermal-wind GENCOs trading in the day-ahead market including bilateral contracts with BSS 期刊论文
IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 卷号: 12, 页码: 3330-3338
作者:  Gong, Naiwei;  Luo, Xianjue;  Ma, Honglian;  Wang, Qi;  Wang, Kaiyan
收藏  |  浏览/下载:12/0  |  提交时间:2019/11/26
Decomposed unit commitment model for long term system with large scale wind power penetration 期刊论文
Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University, 2016, 卷号: 50, 页码: 143-151
作者:  Gong, Benhui;  Wang, Xiuli;  Dang, Can;  Yao, Li;  Hou, Furui
收藏  |  浏览/下载:4/0  |  提交时间:2019/11/26
Capacity allocation of a hybrid energy storage system for power system peak shaving at high wind power penetration level 期刊论文
RENEWABLE ENERGY, 2015, 卷号: 75, 期号: [db:dc_citation_issue], 页码: 541-549
作者:  Zhao, Pan;  Wang, Jiangfeng;  Dai, Yiping
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/02
Feasibility Robustness Evaluation of Unit Commitment in Systems with Wind Power Integration 会议论文
作者:  Lei, Xuejiao;  Guan, Xiaohong;  Zhai, Qiaozhu;  Yang, Yafei
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/02
EV Charging Load Scheduling with High Wind Power Penetration: A Robust Shortest Path Approach 会议论文
作者:  Huang, Qilong;  Jia, Qing-Shan;  Guan, Xiaohong
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/02
Wind power scenario generation for multiple wind farms based on atmospheric dynamic model 期刊论文
Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2015, 卷号: 35, 期号: [db:dc_citation_issue], 页码: 4581-4590
作者:  Li, Pai;  Guan, Xiaohong;  Wu, Jiang
收藏  |  浏览/下载:2/0  |  提交时间:2019/12/02
Security constrained unit commitment with wind power based on evaluation of wind power penetration capacity 期刊论文
Dianwang Jishu/Power System Technology, 2015, 卷号: 39, 期号: [db:dc_citation_issue], 页码: 2398-2403
作者:  Tian, Jianfang;  Mao, Yashan;  Zhai, Qiaozhu;  Wang, Quanzhou
收藏  |  浏览/下载:5/0  |  提交时间:2019/12/02
Adaptability analysis for fault component protection under large scale wind power penetration 会议论文
作者:  Wang, C.Q.;  Song, G.B.;  Shen, Q.Y.
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/02
Security-Constrained Unit Commitment with Large-scale Cross-Region Wind Penetration 会议论文
作者:  Jiao Chunting;  Guan Xiaohong;  Wu Jiang;  Lei Xuejiao;  Li Pan
收藏  |  浏览/下载:6/0  |  提交时间:2019/12/02


©版权所有 ©2017 CSpace - Powered by CSpace