CORC

浏览/检索结果: 共5条,第1-5条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan 期刊论文
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 卷号: 56, 页码: 3226-3244
作者:  Zhang, Guanghui;  Xing, Keyi;  Cao, Feng
收藏  |  浏览/下载:5/0  |  提交时间:2019/11/26
Memetic social spider optimization algorithm for scheduling two-stage assembly flowshop in a distributed environment 期刊论文
Computers and Industrial Engineering, 2018, 卷号: 125, 页码: 423-433
作者:  Zhang, Guanghui;  Xing, Keyi
收藏  |  浏览/下载:4/0  |  提交时间:2019/11/26
Discrete differential evolution algorithm for distributed blocking flowshop scheduling with makespan criterion 期刊论文
Engineering Applications of Artificial Intelligence, 2018, 卷号: 76, 页码: 96-107
作者:  Zhang, Guanghui;  Xing, Keyi;  Cao, Feng
收藏  |  浏览/下载:3/0  |  提交时间:2019/11/26
Meta-heuristics for the distributed two-stage assembly scheduling problem with bi-criteria of makespan and mean completion time 期刊论文
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 卷号: 52, 期号: [db:dc_citation_issue], 页码: 2743-2766
作者:  Xiong, Fuli;  Xing, Keyi
收藏  |  浏览/下载:5/0  |  提交时间:2019/12/03
Minimizing the total completion time in a distributed two stage assembly system with setup times 期刊论文
COMPUTERS & OPERATIONS RESEARCH, 2014, 卷号: 47, 期号: [db:dc_citation_issue], 页码: 92-105
作者:  Xiong, Fuli;  Xing, Keyi;  Wang, Feng;  Lei, Hang;  Han, Libin
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/03


©版权所有 ©2017 CSpace - Powered by CSpace