CORC

浏览/检索结果: 共33条,第1-10条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
Fireworks Explosion Algorithm for Hybrid Flow Shop Scheduling and Optimization Problem1 会议论文
2018 International Conference on Advanced Materials, Intelligent Manufacturing and Automation, AMIMA 2018, China, May 23-26, 2018
作者:  Dong XT(董晓婷);  Liu, Changming;  Han ZH(韩忠华)
收藏  |  浏览/下载:15/0  |  提交时间:2018/08/12
A hybrid discrete artificial bee colony algorithm for multi-objective blocking lot-streaming flow shop scheduling problem 会议论文
作者:  Gong, Dunwei;  Han, Yuyan;  Sun, Jianyong
收藏  |  浏览/下载:4/0  |  提交时间:2019/11/19
A Novel Teaching-Learning-Based Optimization Algorithm for Energy-Efficient Scheduling in Hybrid Flow Shop 期刊论文
IEEE Transactions on Engineering Management, 2018, 卷号: 65, 期号: 2, 页码: 330-340
作者:  Lei, Deming*;  Gao, Liang;  Zheng, Youlian
收藏  |  浏览/下载:10/0  |  提交时间:2019/12/04
Scheduling a realistic hybrid flow shop with stage skipping and adjustable processing time in steel plants 期刊论文
2018, 卷号: 64, 页码: 536-549
作者:  Long, Jianyu[1,2];  Zheng, Zhong[1];  Gao, Xiaoqiang[3];  Pardalos, Panos M.[4]
收藏  |  浏览/下载:4/0  |  提交时间:2019/11/28
A migrating bird algorithm for two-stage assembly flow shop problem with bottleneck 会议论文
48th International Conference on Computers and Industrial Engineering, CIE 2018, Auckland, New zealand, 2018-12-02
作者:  Meng, Qiunan;  Sun, Yingying;  Xu, Xun
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/02
Batch-sequencing with improved ant colony algorithm for synchronous flow shop under supply of components 会议论文
48th International Conference on Computers and Industrial Engineering, CIE 2018, Auckland, New zealand, 2018-12-02
作者:  Meng, Qiunan;  Sun, Yingying;  Xu, Xun
收藏  |  浏览/下载:5/0  |  提交时间:2019/12/02
A New Approximation Algorithm for Flow Shop with Transporter Coordinate 会议论文
THEORETICAL COMPUTER SCIENCE (NCTCS 2018), 2018-01-01
作者:  Han, Xin;  Wang, Yinling
收藏  |  浏览/下载:8/0  |  提交时间:2019/12/02
A two-stage three-machine assembly scheduling problem with a position-based learning effect 期刊论文
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 卷号: 56, 页码: 3064-3079
作者:  Wu, Chin-Chia;  Wang, Du-Juan;  Cheng, Shuenn-Ren;  Chung, I-Hong;  Lin, Win-Chin
收藏  |  浏览/下载:8/0  |  提交时间:2019/12/02
No-wait two-machine permutation flow shop scheduling problem with learning effect, common due date and controllable job processing times 期刊论文
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 卷号: 56, 页码: 2361-2369
作者:  Gao, Fu;  Liu, Mengqi;  Wang, Jian-Jun;  Lu, Yuan-Yuan
收藏  |  浏览/下载:6/0  |  提交时间:2019/12/02
A MIGRATING BIRD ALGORITHM FOR TWO-STAGE ASSEMBLY FLOW SHOP PROBLEM WITH BOTTLENECK 会议论文
CIE48 Proceedings, 2-5 December 2018, The University of Auckland
作者:  Meng QN(蒙秋男);  Sun YY(孙莹莹);  xun xu
收藏  |  浏览/下载:7/0  |  提交时间:2019/12/02


©版权所有 ©2017 CSpace - Powered by CSpace