CORC

浏览/检索结果: 共4条,第1-4条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
云南干河泵站地下厂房通风系统模型试验 Experiment on the Ventilation System Model of the Underground Powerhouse of Yunan's Ganhe Pumping Station 期刊论文
2014, 卷号: 41, 页码: 107-112
作者:  陈金华[1];  马晴[2];  夏磊[2];  彭运林[3];  郭建平[4]
收藏  |  浏览/下载:7/0  |  提交时间:2019/11/28
Experiment on the ventilation system model of the underground powerhouse of Yunan's Ganhe pumping station 期刊论文
2014, 卷号: 41, 页码: 107-112
作者:  Chen, Jin-Hua[1];  Ma, Qing[2];  Xia, Lei[2];  Peng, Yun-Lin[3];  Guo, Jian-Ping[4]
收藏  |  浏览/下载:3/0  |  提交时间:2019/11/29
Regional power grid IMLD water-pumping energy-accumulating power station short-term multi-group network load distribution method, involves calculating iteration time value, determining station number, and calculating load of power station. 专利
申请日期: 2014-01-01, 公开日期: 2014
作者:  LIU Y LU J CHENG C CHENG X WU X SHE
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/11
Analysis on the flow field of inlet structure of Xingshipo pumping station by CFD mehtod 期刊论文
IET Conference Publications, 2014, 卷号: 2014, 期号: CP658
作者:  Bi, Shude;  Liu, Meiqing;  Xu, Maosen;  Long, Xinping
收藏  |  浏览/下载:1/0  |  提交时间:2019/12/05


©版权所有 ©2017 CSpace - Powered by CSpace