An improved MOEA/D for multi-objective job shop scheduling problem | |
Zhao, Fuqing1,3; Chen, Zhen1; Wang, Junbiao3; Zhang, Chuck2 | |
刊名 | International Journal of Computer Integrated Manufacturing
![]() |
2017-06-03 | |
卷号 | 30期号:6页码:616-640 |
关键词 | Decomposition Evolutionary algorithms Machine shops Multiobjective optimization Scheduling Adaptive mechanism Convergence performance Convergence speed Initial population Job shop scheduling problems Multi objective evolutionary algorithms Multi-objective job shop scheduling Multiple-objectives |
ISSN号 | 0951192X |
DOI | 10.1080/0951192X.2016.1187301 |
英文摘要 | In this article, an improved multi-objective evolutionary algorithm, which is based on decomposition (IMOEA/D) for multi-objective job shop scheduling problem, is proposed to solve multiple objectives job shop scheduling problems. Three minimisation objectives–the maximum completion time (makespan), the total flow time and the tardiness time are considered simultaneously. In the proposed algorithm, several prior rules are presented to construct the initial population with a high level of quality. Meanwhile, according to the contribution of each operator to the external archive, an adaptive mechanism is adopted to select corresponding operators to generate new solutions, which can accelerate convergence speed. Simulation results on the standard test instances show that IMOEA/D has a better convergence performance compared with multi-objective evolutionary algorithms based on Pareto dominance. © 2016 Informa UK Limited, trading as Taylor & Francis Group. |
WOS研究方向 | Computer Science ; Engineering ; Operations Research & Management Science |
语种 | 英语 |
出版者 | Taylor and Francis Ltd. |
WOS记录号 | WOS:000397233700009 |
内容类型 | 期刊论文 |
源URL | [http://ir.lut.edu.cn/handle/2XXMBERH/150201] ![]() |
专题 | 国际合作处(港澳台办) |
作者单位 | 1.School of Computer and Communication, Lanzhou University of Technology, Lanzhou, China; 2.H. Milton Stewart School of Industrial & Systems Engineering, Georgia Institute of Technology, Atlanta; GA, United States 3.Key Laboratory of Contemporary Design & Integrated Manufacturing Technology, Ministry of Education, Northwestern Polytechnical University, Xi’an, China; |
推荐引用方式 GB/T 7714 | Zhao, Fuqing,Chen, Zhen,Wang, Junbiao,et al. An improved MOEA/D for multi-objective job shop scheduling problem[J]. International Journal of Computer Integrated Manufacturing,2017,30(6):616-640. |
APA | Zhao, Fuqing,Chen, Zhen,Wang, Junbiao,&Zhang, Chuck.(2017).An improved MOEA/D for multi-objective job shop scheduling problem.International Journal of Computer Integrated Manufacturing,30(6),616-640. |
MLA | Zhao, Fuqing,et al."An improved MOEA/D for multi-objective job shop scheduling problem".International Journal of Computer Integrated Manufacturing 30.6(2017):616-640. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论