CORC  > 兰州理工大学  > 兰州理工大学  > 国际合作处(港澳台办)
An improved MOEA/D for multi-objective job shop scheduling problem
Zhao, Fuqing1,3; Chen, Zhen1; Wang, Junbiao3; Zhang, Chuck2
刊名International Journal of Computer Integrated Manufacturing
2017-06-03
卷号30期号:6页码:616-640
关键词Decomposition Evolutionary algorithms Machine shops Multiobjective optimization Scheduling Adaptive mechanism Convergence performance Convergence speed Initial population Job shop scheduling problems Multi objective evolutionary algorithms Multi-objective job shop scheduling Multiple-objectives
ISSN号0951192X
DOI10.1080/0951192X.2016.1187301
英文摘要In this article, an improved multi-objective evolutionary algorithm, which is based on decomposition (IMOEA/D) for multi-objective job shop scheduling problem, is proposed to solve multiple objectives job shop scheduling problems. Three minimisation objectives–the maximum completion time (makespan), the total flow time and the tardiness time are considered simultaneously. In the proposed algorithm, several prior rules are presented to construct the initial population with a high level of quality. Meanwhile, according to the contribution of each operator to the external archive, an adaptive mechanism is adopted to select corresponding operators to generate new solutions, which can accelerate convergence speed. Simulation results on the standard test instances show that IMOEA/D has a better convergence performance compared with multi-objective evolutionary algorithms based on Pareto dominance. © 2016 Informa UK Limited, trading as Taylor & Francis Group.
WOS研究方向Computer Science ; Engineering ; Operations Research & Management Science
语种英语
出版者Taylor and Francis Ltd.
WOS记录号WOS:000397233700009
内容类型期刊论文
源URL[http://ir.lut.edu.cn/handle/2XXMBERH/150201]  
专题国际合作处(港澳台办)
作者单位1.School of Computer and Communication, Lanzhou University of Technology, Lanzhou, China;
2.H. Milton Stewart School of Industrial & Systems Engineering, Georgia Institute of Technology, Atlanta; GA, United States
3.Key Laboratory of Contemporary Design & Integrated Manufacturing Technology, Ministry of Education, Northwestern Polytechnical University, Xi’an, China;
推荐引用方式
GB/T 7714
Zhao, Fuqing,Chen, Zhen,Wang, Junbiao,et al. An improved MOEA/D for multi-objective job shop scheduling problem[J]. International Journal of Computer Integrated Manufacturing,2017,30(6):616-640.
APA Zhao, Fuqing,Chen, Zhen,Wang, Junbiao,&Zhang, Chuck.(2017).An improved MOEA/D for multi-objective job shop scheduling problem.International Journal of Computer Integrated Manufacturing,30(6),616-640.
MLA Zhao, Fuqing,et al."An improved MOEA/D for multi-objective job shop scheduling problem".International Journal of Computer Integrated Manufacturing 30.6(2017):616-640.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace