CORC  > 北京航空航天大学
Scheduling Policies for the Stochastic Resource Leveling Problem
Li, Hongbo; Xu, Zhe; Demeulemeester, Erik
刊名JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
2015
卷号141
关键词Project scheduling Scheduling policies Stochastic resource leveling problem Stochastic activity durations Tabu search Cost and schedule
ISSN号0733-9364
DOI10.1061/(ASCE)CO.19437862.0000936
URL标识查看原文
收录类别SCIE ; EI
WOS记录号WOS:000347975900013
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/5961012
专题北京航空航天大学
推荐引用方式
GB/T 7714
Li, Hongbo,Xu, Zhe,Demeulemeester, Erik. Scheduling Policies for the Stochastic Resource Leveling Problem[J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT,2015,141.
APA Li, Hongbo,Xu, Zhe,&Demeulemeester, Erik.(2015).Scheduling Policies for the Stochastic Resource Leveling Problem.JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT,141.
MLA Li, Hongbo,et al."Scheduling Policies for the Stochastic Resource Leveling Problem".JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT 141(2015).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace