Creating bus timetables with maximal synchronization by a new algorithm based on the PSO | |
Tian, D.; Liu, W.; Guo, P.; Rong, H.; Wang, W.; Gong, J.; Wang, Y.; Liu, H. | |
2018 | |
会议名称 | CICTP 2017: Transportation Reform and Change - Equity, Inclusiveness, Sharing, and Innovation - Proceedings of the 17th COTA International Conference of Transportation Professionals |
关键词 | Integer programming Iterative methods Optimization Particle swarm optimization (PSO) Scheduling Synchronization Mixed integer linear programming problems Waiting time Problem solving |
卷号 | 2018-January |
页码 | 945-954 |
URL标识 | 查看原文 |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/5933899 |
专题 | 北京航空航天大学 |
推荐引用方式 GB/T 7714 | Tian, D.,Liu, W.,Guo, P.,et al. Creating bus timetables with maximal synchronization by a new algorithm based on the PSO[C]. 见:CICTP 2017: Transportation Reform and Change - Equity, Inclusiveness, Sharing, and Innovation - Proceedings of the 17th COTA International Conference of Transportation Professionals. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论