Using Iterated Greedy with a New Population Approach for the Flexible Job-shop Scheduling Problem | |
Al Aqel, G.; Li, X.*; Gao, L.; Gong, W.; Wang, R.; Ren, T.; Wu, G. | |
2018 | |
会议名称 | IEEE International Conference on Industrial Engineering and Engineering Management (IEEE IEEM) |
会议日期 | DEC 16-19, 2018 |
会议地点 | Bangkok, THAILAND |
关键词 | Flexible Job-shop Scheduling Problem Iterated Greedy Telescopic Population |
页码 | 1235-1239 |
会议录 | 2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM)
![]() |
URL标识 | 查看原文 |
ISSN号 | 2157-3611 |
WOS记录号 | WOS:000458674600247 |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/5733759 |
专题 | 中南林业科技大学 |
作者单位 | 1.[Al Aqel, G. 2.Gao, L. 3.Li, X.] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan, Hubei, Peoples R China. |
推荐引用方式 GB/T 7714 | Al Aqel, G.,Li, X.*,Gao, L.,et al. Using Iterated Greedy with a New Population Approach for the Flexible Job-shop Scheduling Problem[C]. 见:IEEE International Conference on Industrial Engineering and Engineering Management (IEEE IEEM). Bangkok, THAILAND. DEC 16-19, 2018. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论