CORC  > 湖南农业大学
A stochastic scheduling algorithm for precedence constrained tasks on Grid
Tang, Xiaoyong*; Li, Kenli; Liao, Guiping; Fang, Kui; Wu, Fan
刊名Future Generation Computer Systems
2011
卷号27期号:8页码:1083-1091
关键词Stochastic scheduling Grid Precedence constrained tasks Makespan
ISSN号0167-739X
DOI10.1016/j.future.2011.04.007
URL标识查看原文
WOS记录号WOS:000294521200009;EI:20112914167274
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/5115513
专题湖南农业大学
作者单位1.[Fang, Kui
2.Liao, Guiping
3.Tang, Xiaoyong] Hunan Agr Univ, Informat Sci & Technol Coll, Changsha, Hunan, Peoples R China.
推荐引用方式
GB/T 7714
Tang, Xiaoyong*,Li, Kenli,Liao, Guiping,et al. A stochastic scheduling algorithm for precedence constrained tasks on Grid[J]. Future Generation Computer Systems,2011,27(8):1083-1091.
APA Tang, Xiaoyong*,Li, Kenli,Liao, Guiping,Fang, Kui,&Wu, Fan.(2011).A stochastic scheduling algorithm for precedence constrained tasks on Grid.Future Generation Computer Systems,27(8),1083-1091.
MLA Tang, Xiaoyong*,et al."A stochastic scheduling algorithm for precedence constrained tasks on Grid".Future Generation Computer Systems 27.8(2011):1083-1091.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace