Scheduling jobs with chain precedence constraints and deteriorating jobs | |
Wang, J-B; Wang, J-J; Ji, P. | |
刊名 | JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
![]() |
2011 | |
卷号 | 62页码:1765-1770 |
关键词 | scheduling single machine deteriorating jobs weighted sum of squared completion times |
ISSN号 | 0160-5682 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4843575 |
专题 | 大连理工大学 |
作者单位 | 1.Shenyang Aerosp Univ, Sch Sci, Operat Res & Cybernet Inst, Shenyang 110136, Peoples R China. 2.Dalian Univ Technol, Dalian, Peoples R China. 3.Hong Kong Polytech Univ, Kowloon, Hong Kong, Peoples R China. |
推荐引用方式 GB/T 7714 | Wang, J-B,Wang, J-J,Ji, P.. Scheduling jobs with chain precedence constraints and deteriorating jobs[J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY,2011,62:1765-1770. |
APA | Wang, J-B,Wang, J-J,&Ji, P..(2011).Scheduling jobs with chain precedence constraints and deteriorating jobs.JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY,62,1765-1770. |
MLA | Wang, J-B,et al."Scheduling jobs with chain precedence constraints and deteriorating jobs".JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY 62(2011):1765-1770. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论