A tradeoff between unit capacity and average production cost in spinning reserve optimization | |
Wang, M. Q.; Gooi, H. B.; Han, X. S. | |
刊名 | INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS |
2015 | |
卷号 | 71页码:215-221 |
关键词 | Expected energy not supplied (EENS) Spinning reserve (SR) System spinning reserve (SSR) Tradeoff Unit commitment (UC) |
DOI | 10.1016/j.ijepes.2015.02.019 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4775437 |
专题 | 山东大学 |
作者单位 | 1.Shandong Univ, Minist Educ, Key Lab Power Syst Intelligent Dispatch & Control, Jinan 250061, Peoples R China. 2.[Gooi, H. B |
推荐引用方式 GB/T 7714 | Wang, M. Q.,Gooi, H. B.,Han, X. S.. A tradeoff between unit capacity and average production cost in spinning reserve optimization[J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,2015,71:215-221. |
APA | Wang, M. Q.,Gooi, H. B.,&Han, X. S..(2015).A tradeoff between unit capacity and average production cost in spinning reserve optimization.INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,71,215-221. |
MLA | Wang, M. Q.,et al."A tradeoff between unit capacity and average production cost in spinning reserve optimization".INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS 71(2015):215-221. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论