Water-Bearing Body Prospecting Ahead of Tunnel Face Using Moving Electrical-Source Method | |
Guo, Qian; Nie, Lichao; Li, Ningbo; Yang, Weimin; Lin, Chunjin; Liu, Benchao; Shi, Yingnan | |
刊名 | Geotechnical and Geological Engineering |
2019 | |
卷号 | 37期号:3页码:2047-2064 |
关键词 | Constrained inversion with inequality constraints Electrical resistivity Moving electrical-source method Tunnel ahead geological prospecting Water-bearing body |
DOI | 10.1007/s10706-018-0743-0 |
URL标识 | 查看原文 |
公开日期 | [db:dc_date_available] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4547864 |
专题 | 山东大学 |
作者单位 | Geotechnical and Structural Engineering Research Center, Shandong Un |
推荐引用方式 GB/T 7714 | Guo, Qian,Nie, Lichao,Li, Ningbo,et al. Water-Bearing Body Prospecting Ahead of Tunnel Face Using Moving Electrical-Source Method[J]. Geotechnical and Geological Engineering,2019,37(3):2047-2064. |
APA | Guo, Qian.,Nie, Lichao.,Li, Ningbo.,Yang, Weimin.,Lin, Chunjin.,...&Shi, Yingnan.(2019).Water-Bearing Body Prospecting Ahead of Tunnel Face Using Moving Electrical-Source Method.Geotechnical and Geological Engineering,37(3),2047-2064. |
MLA | Guo, Qian,et al."Water-Bearing Body Prospecting Ahead of Tunnel Face Using Moving Electrical-Source Method".Geotechnical and Geological Engineering 37.3(2019):2047-2064. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论