CORC  > 山东大学
Water-Bearing Body Prospecting Ahead of Tunnel Face Using Moving Electrical-Source Method
Guo, Qian; Nie, Lichao; Li, Ningbo; Yang, Weimin; Lin, Chunjin; Liu, Benchao; Shi, Yingnan
刊名Geotechnical and Geological Engineering
2019
卷号37期号:3页码:2047-2064
关键词Constrained inversion with inequality constraints Electrical resistivity Moving electrical-source method Tunnel ahead geological prospecting Water-bearing body
DOI10.1007/s10706-018-0743-0
URL标识查看原文
公开日期[db:dc_date_available]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4547864
专题山东大学
作者单位Geotechnical and Structural Engineering Research Center, Shandong Un
推荐引用方式
GB/T 7714
Guo, Qian,Nie, Lichao,Li, Ningbo,et al. Water-Bearing Body Prospecting Ahead of Tunnel Face Using Moving Electrical-Source Method[J]. Geotechnical and Geological Engineering,2019,37(3):2047-2064.
APA Guo, Qian.,Nie, Lichao.,Li, Ningbo.,Yang, Weimin.,Lin, Chunjin.,...&Shi, Yingnan.(2019).Water-Bearing Body Prospecting Ahead of Tunnel Face Using Moving Electrical-Source Method.Geotechnical and Geological Engineering,37(3),2047-2064.
MLA Guo, Qian,et al."Water-Bearing Body Prospecting Ahead of Tunnel Face Using Moving Electrical-Source Method".Geotechnical and Geological Engineering 37.3(2019):2047-2064.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace