CORC  > 山东大学
Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China
Chen, Lei; Wang, Huitao; Xu, Xinji; Zhang, Qingsong; Li, Ningbo; Zhang, Lingli
刊名Geotechnical and Geological Engineering
2019
卷号37期号:1页码:267-281
关键词Case study Grouting test Migration result Seismic ahead prospecting Tunnel Velocity analysis
DOI10.1007/s10706-018-0607-7
URL标识查看原文
公开日期[db:dc_date_available]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4533588
专题山东大学
作者单位Geotechnical and Structural Engineering Research Center, Shandong University, Ji
推荐引用方式
GB/T 7714
Chen, Lei,Wang, Huitao,Xu, Xinji,et al. Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China[J]. Geotechnical and Geological Engineering,2019,37(1):267-281.
APA Chen, Lei,Wang, Huitao,Xu, Xinji,Zhang, Qingsong,Li, Ningbo,&Zhang, Lingli.(2019).Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China.Geotechnical and Geological Engineering,37(1),267-281.
MLA Chen, Lei,et al."Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China".Geotechnical and Geological Engineering 37.1(2019):267-281.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace