Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China | |
Chen, Lei; Wang, Huitao; Xu, Xinji; Zhang, Qingsong; Li, Ningbo; Zhang, Lingli | |
刊名 | Geotechnical and Geological Engineering |
2019 | |
卷号 | 37期号:1页码:267-281 |
关键词 | Case study Grouting test Migration result Seismic ahead prospecting Tunnel Velocity analysis |
DOI | 10.1007/s10706-018-0607-7 |
URL标识 | 查看原文 |
公开日期 | [db:dc_date_available] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4533588 |
专题 | 山东大学 |
作者单位 | Geotechnical and Structural Engineering Research Center, Shandong University, Ji |
推荐引用方式 GB/T 7714 | Chen, Lei,Wang, Huitao,Xu, Xinji,et al. Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China[J]. Geotechnical and Geological Engineering,2019,37(1):267-281. |
APA | Chen, Lei,Wang, Huitao,Xu, Xinji,Zhang, Qingsong,Li, Ningbo,&Zhang, Lingli.(2019).Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China.Geotechnical and Geological Engineering,37(1),267-281. |
MLA | Chen, Lei,et al."Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China".Geotechnical and Geological Engineering 37.1(2019):267-281. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论