Improving efficiencies of flood forecasting during lead times: an operational method and its application in the Baiyunshan Reservoir | |
Liu, Pan; Zhang, Xiaojing; Zhao, Yan; Deng, Chao; Li, Zejun; Xiong, Mengsi | |
刊名 | HYDROLOGY RESEARCH |
2019 | |
卷号 | 50期号:2 |
关键词 | flood forecasting lead time objective function Xinanjiang model |
ISSN号 | 0029-1277 |
DOI | 10.2166/nh.2018.051 |
URL标识 | 查看原文 |
收录类别 | SCIE |
语种 | 英语 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4263375 |
专题 | 武汉大学 |
推荐引用方式 GB/T 7714 | Liu, Pan,Zhang, Xiaojing,Zhao, Yan,et al. Improving efficiencies of flood forecasting during lead times: an operational method and its application in the Baiyunshan Reservoir[J]. HYDROLOGY RESEARCH,2019,50(2). |
APA | Liu, Pan,Zhang, Xiaojing,Zhao, Yan,Deng, Chao,Li, Zejun,&Xiong, Mengsi.(2019).Improving efficiencies of flood forecasting during lead times: an operational method and its application in the Baiyunshan Reservoir.HYDROLOGY RESEARCH,50(2). |
MLA | Liu, Pan,et al."Improving efficiencies of flood forecasting during lead times: an operational method and its application in the Baiyunshan Reservoir".HYDROLOGY RESEARCH 50.2(2019). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论