A suspended sediment budget of the Yichang-Wuhan reach of the Yangtze river, China
Xu J. X.
2008
关键词sediment deposition channel sediment budget scour-fill behaviour environmental change Yangtze River lower yellow-river channel adjustment basin discharges floods zones
英文摘要The amount of the sediment deposition in the Yichan-Wuhan reach of the middle Yangtze River (also known as Changjiang River) has been determined using the concept of sediment budget at the channel-reach scale. The fill-scour processes of the middle Yangtze River were studied during the period 1956-1997 in response to the variation in sediment load and flow inputs. The results show that 13.3% of the net input of sediment was deposited in the studied river reach. Since 1956, the output sediment load of the studied reach increased with time to 1981, followed by a decline. The increase in output before 1981 can be related to the man-made bend neck-cutoff which caused a decrease in the sediment load diverted through the 'three outfalls' (i.e. the three distributaries from the Yangtze main stem to the Dongting Lake) and increased the sediment-carrying capacity of the river. Thereby, the river could transport more sediment to the outlet of the studied river reach. The decrease in the sediment load output after 1984 was directly due to the decreased sediment load at Yichang station. Multiple regression equations have been established to assess the contributions of influencing factors to the variation in sediment deposition amount in the studied river reach.
出处Geografiska Annaler Series a-Physical Geography
90A
2
173-186
收录类别SCI
语种英语
ISSN号0435-3676
内容类型SCI/SSCI论文
源URL[http://ir.igsnrr.ac.cn/handle/311030/22679]  
专题地理科学与资源研究所_历年回溯文献
推荐引用方式
GB/T 7714
Xu J. X.. A suspended sediment budget of the Yichang-Wuhan reach of the Yangtze river, China. 2008.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace