Estimation and measurement of closed-loop delays in the actual WACS of Guizhou Power Grid | |
Zhang, Fang; Cheng, Lin; Li, Xiong; Min, Zeng; Sun, Yuanzhang; Chow, Joe H. | |
刊名 | IEEE Power and Energy Society General Meeting |
2016 | |
卷号 | 2016-November |
ISSN号 | 1944-9925 |
DOI | 10.1109/PESGM.2016.7741916 |
URL标识 | 查看原文 |
收录类别 | EI |
语种 | 英语 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4054138 |
专题 | 武汉大学 |
推荐引用方式 GB/T 7714 | Zhang, Fang,Cheng, Lin,Li, Xiong,et al. Estimation and measurement of closed-loop delays in the actual WACS of Guizhou Power Grid[J]. IEEE Power and Energy Society General Meeting,2016,2016-November. |
APA | Zhang, Fang,Cheng, Lin,Li, Xiong,Min, Zeng,Sun, Yuanzhang,&Chow, Joe H..(2016).Estimation and measurement of closed-loop delays in the actual WACS of Guizhou Power Grid.IEEE Power and Energy Society General Meeting,2016-November. |
MLA | Zhang, Fang,et al."Estimation and measurement of closed-loop delays in the actual WACS of Guizhou Power Grid".IEEE Power and Energy Society General Meeting 2016-November(2016). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论