Current status and progresses of SSRF project
Xu, HJ(徐洪杰) ; Zhao, ZT(赵振堂)
刊名NUCLEAR SCIENCE AND TECHNIQUES
2008
卷号19期号:1页码:1
ISSN号1001-8042
通讯作者Xu, HJ (reprint author), Chinese Acad Sci, Shanghai Inst Appl Phys, Shanghai 201800, Peoples R China
英文摘要The Shanghai Synchrotron Radiation Facility (SSRF), a third generation light source, comprises a 3.5GeV electron storage ring, a full energy booster, a 150 MeV linac, and seven beamlines in Phase I of the project. Beginning at the end of 2004 with a groundbreaking ceremony, the accelerators were installed in ten months from November 2006, and were successfully tested and commissioned in the past a couple of months. On December 21, 2007, storing electron beams in the storage ring was realized, and the first synchrotron radiations were observed three days later on the front-end of Beamline BL16B of the facility. Now, it runs 3 GeV 100 mA beams with a lifetime of 8 similar to 10 hours. Meanwhile, construction of the first seven beamlines (five ID beamlines and two bending magnet beamlines) is progressing on schedule.
学科主题Physics
收录类别SCI
语种英语
WOS记录号WOS:000254968500001
公开日期2012-04-18
内容类型期刊论文
源URL[http://ir.sinap.ac.cn/handle/331007/7681]  
专题上海应用物理研究所_中科院上海应用物理研究所2004-2010年
推荐引用方式
GB/T 7714
Xu, HJ,Zhao, ZT. Current status and progresses of SSRF project[J]. NUCLEAR SCIENCE AND TECHNIQUES,2008,19(1):1.
APA Xu, HJ,&Zhao, ZT.(2008).Current status and progresses of SSRF project.NUCLEAR SCIENCE AND TECHNIQUES,19(1),1.
MLA Xu, HJ,et al."Current status and progresses of SSRF project".NUCLEAR SCIENCE AND TECHNIQUES 19.1(2008):1.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace