Research on pseudo-static cyclic tests of precast concrete shear walls with vertical rebar lapping in grout-filled constrained hole | |
Gu, Qian*; Dong, Ge*; Wang, Xiang; Jiang, Hongbin; Peng, Shaomin | |
刊名 | Engineering Structures
![]() |
2019 | |
卷号 | 189页码:396-410 |
关键词 | Precast concrete shear wall Horizontal assembly joint Vertical rebar lap splice Prepared grout-filled hole Constraining spiral hoop Cyclic test Seismic behavior |
ISSN号 | 0141-0296 |
DOI | 10.1016/j.engstruct.2019.03.069 |
URL标识 | 查看原文 |
WOS记录号 | WOS:000466827100032 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3400183 |
专题 | 武汉理工大学 |
作者单位 | 1.[Peng, Shaomin 2.Gu, Qian 3.Dong, Ge] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Hubei, Peoples R China. |
推荐引用方式 GB/T 7714 | Gu, Qian*,Dong, Ge*,Wang, Xiang,et al. Research on pseudo-static cyclic tests of precast concrete shear walls with vertical rebar lapping in grout-filled constrained hole[J]. Engineering Structures,2019,189:396-410. |
APA | Gu, Qian*,Dong, Ge*,Wang, Xiang,Jiang, Hongbin,&Peng, Shaomin.(2019).Research on pseudo-static cyclic tests of precast concrete shear walls with vertical rebar lapping in grout-filled constrained hole.Engineering Structures,189,396-410. |
MLA | Gu, Qian*,et al."Research on pseudo-static cyclic tests of precast concrete shear walls with vertical rebar lapping in grout-filled constrained hole".Engineering Structures 189(2019):396-410. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论