CORC  > 暨南大学
Scheduling the fabrication and assembly of components in a two-machine flowshop
Cheng, TCE; Wang, GQ
1999
卷号31期号:[db:dc_citation_issue]页码:135
DOI[db:dc_identifier_doi]
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3327258
专题暨南大学
作者单位1.[1]Hong Kong Polytech Univ, Off Vice President Res & Postgrad Studies, Kowloon, Hong Kong
2.[2]Jinan Univ, Dept Business Adm, Guangzhou, Peoples R China
推荐引用方式
GB/T 7714
Cheng, TCE,Wang, GQ. Scheduling the fabrication and assembly of components in a two-machine flowshop[J],1999,31([db:dc_citation_issue]):135.
APA Cheng, TCE,&Wang, GQ.(1999).Scheduling the fabrication and assembly of components in a two-machine flowshop.,31([db:dc_citation_issue]),135.
MLA Cheng, TCE,et al."Scheduling the fabrication and assembly of components in a two-machine flowshop".31.[db:dc_citation_issue](1999):135.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace