Scheduling the fabrication and assembly of components in a two-machine flowshop | |
Cheng, TCE; Wang, GQ | |
1999 | |
卷号 | 31期号:[db:dc_citation_issue]页码:135 |
DOI | [db:dc_identifier_doi] |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3327258 |
专题 | 暨南大学 |
作者单位 | 1.[1]Hong Kong Polytech Univ, Off Vice President Res & Postgrad Studies, Kowloon, Hong Kong 2.[2]Jinan Univ, Dept Business Adm, Guangzhou, Peoples R China |
推荐引用方式 GB/T 7714 | Cheng, TCE,Wang, GQ. Scheduling the fabrication and assembly of components in a two-machine flowshop[J],1999,31([db:dc_citation_issue]):135. |
APA | Cheng, TCE,&Wang, GQ.(1999).Scheduling the fabrication and assembly of components in a two-machine flowshop.,31([db:dc_citation_issue]),135. |
MLA | Cheng, TCE,et al."Scheduling the fabrication and assembly of components in a two-machine flowshop".31.[db:dc_citation_issue](1999):135. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论