Study on two stage supply chain negotiation rescheduling model and algorithm based on non-complete-trust | |
Bo, Hongguang; Li, Huanzhi; Zhang, Huilin; Mu, Wei; Lyv, Guobing | |
2017 | |
会议名称 | PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON MATERIALS ENGINEERING AND INFORMATION TECHNOLOGY APPLICATIONS (MEITA 2016) |
会议日期 | 2017-01-01 |
关键词 | Rescheduling Non-complete-trust PSO Neighborhood search |
页码 | 299-303 |
会议录 | PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON MATERIALS ENGINEERING AND INFORMATION TECHNOLOGY APPLICATIONS (MEITA 2016)
![]() |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3300520 |
专题 | 大连理工大学 |
作者单位 | 1.Dalian Univ Technol, Fac Management & Econ, Dalian 1162024, Peoples R China. 2.CSR Qingdao Sifang Co Ltd, Qingdao 266111, Peoples R China. 3.Beijing Xinli Machinery Co Ltd, Beijing 100039, Peoples R China. |
推荐引用方式 GB/T 7714 | Bo, Hongguang,Li, Huanzhi,Zhang, Huilin,et al. Study on two stage supply chain negotiation rescheduling model and algorithm based on non-complete-trust[C]. 见:PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON MATERIALS ENGINEERING AND INFORMATION TECHNOLOGY APPLICATIONS (MEITA 2016). 2017-01-01. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论