CORC  > 西安交通大学
Low-carbon scheduling and estimating for a flexible job shop based on carbon footprint and carbon efficiency of multi-job processing
Zhang, Chaoyang; Gu, Peihua; Jiang, Pingyu
刊名PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE
2015
卷号229期号:[db:dc_citation_issue]页码:328-342
关键词Pareto optimality Carbon footprint carbon efficiency flexible job-shop scheduling problem neighborhood search
ISSN号0954-4054
DOI[db:dc_identifier_doi]
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3267694
专题西安交通大学
推荐引用方式
GB/T 7714
Zhang, Chaoyang,Gu, Peihua,Jiang, Pingyu. Low-carbon scheduling and estimating for a flexible job shop based on carbon footprint and carbon efficiency of multi-job processing[J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE,2015,229([db:dc_citation_issue]):328-342.
APA Zhang, Chaoyang,Gu, Peihua,&Jiang, Pingyu.(2015).Low-carbon scheduling and estimating for a flexible job shop based on carbon footprint and carbon efficiency of multi-job processing.PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE,229([db:dc_citation_issue]),328-342.
MLA Zhang, Chaoyang,et al."Low-carbon scheduling and estimating for a flexible job shop based on carbon footprint and carbon efficiency of multi-job processing".PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE 229.[db:dc_citation_issue](2015):328-342.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace