Low-carbon scheduling and estimating for a flexible job shop based on carbon footprint and carbon efficiency of multi-job processing | |
Zhang, Chaoyang; Gu, Peihua; Jiang, Pingyu | |
刊名 | PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE |
2015 | |
卷号 | 229期号:[db:dc_citation_issue]页码:328-342 |
关键词 | Pareto optimality Carbon footprint carbon efficiency flexible job-shop scheduling problem neighborhood search |
ISSN号 | 0954-4054 |
DOI | [db:dc_identifier_doi] |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3267694 |
专题 | 西安交通大学 |
推荐引用方式 GB/T 7714 | Zhang, Chaoyang,Gu, Peihua,Jiang, Pingyu. Low-carbon scheduling and estimating for a flexible job shop based on carbon footprint and carbon efficiency of multi-job processing[J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE,2015,229([db:dc_citation_issue]):328-342. |
APA | Zhang, Chaoyang,Gu, Peihua,&Jiang, Pingyu.(2015).Low-carbon scheduling and estimating for a flexible job shop based on carbon footprint and carbon efficiency of multi-job processing.PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE,229([db:dc_citation_issue]),328-342. |
MLA | Zhang, Chaoyang,et al."Low-carbon scheduling and estimating for a flexible job shop based on carbon footprint and carbon efficiency of multi-job processing".PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE 229.[db:dc_citation_issue](2015):328-342. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论