Single machine due window assignment scheduling problem with precedence constraints and fuzzy processing times | |
Li, Jinquan; Xu, Dehua; Li, Hongxing | |
刊名 | JOURNAL OF INTELLIGENT & FUZZY SYSTEMS
![]() |
2018 | |
卷号 | 34页码:4301-4314 |
关键词 | Fuzzy set fuzzy number possibilistic mean value and variance due window assignment scheduling precedence constraints |
ISSN号 | 1064-1246 |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3263649 |
专题 | 大连理工大学 |
作者单位 | 1.Beijing Normal Univ, Sch Appl Math, Zhuhai, Guangdong, Peoples R China. 2.Key Lab Intelligent Control, Zhuhai, Guangdong, Peoples R China. 3.Nanjing Univ Finance & Econ, Sch Int Econ & Business, Nanjing, Jiangsu, Peoples R China. 4.Dalian Univ Technol, Sch Control Sci & Engn, Dalian, Peoples R China. 5.Key Lab Intelligent Control, Zhuhai, Guangdong, Peoples R China. |
推荐引用方式 GB/T 7714 | Li, Jinquan,Xu, Dehua,Li, Hongxing. Single machine due window assignment scheduling problem with precedence constraints and fuzzy processing times[J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS,2018,34:4301-4314. |
APA | Li, Jinquan,Xu, Dehua,&Li, Hongxing.(2018).Single machine due window assignment scheduling problem with precedence constraints and fuzzy processing times.JOURNAL OF INTELLIGENT & FUZZY SYSTEMS,34,4301-4314. |
MLA | Li, Jinquan,et al."Single machine due window assignment scheduling problem with precedence constraints and fuzzy processing times".JOURNAL OF INTELLIGENT & FUZZY SYSTEMS 34(2018):4301-4314. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论