CORC  > 西安交通大学
Job-shop scheduling and preventive maintenance considering setup time
Yu, Mingrang; Zhang, Yingjie; Chen, Kun; Gao, Rui; Zhang, Ding
刊名Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University
2015
卷号49期号:[db:dc_citation_issue]页码:16-21
关键词Failure Probability Integrated plans Job shop scheduling problems Preventive maintenance (pm) Scheduling performance Scheduling theory Set-up time Shifting strategy
ISSN号0253-987X
DOI[db:dc_identifier_doi]
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3236153
专题西安交通大学
推荐引用方式
GB/T 7714
Yu, Mingrang,Zhang, Yingjie,Chen, Kun,et al. Job-shop scheduling and preventive maintenance considering setup time[J]. Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University,2015,49([db:dc_citation_issue]):16-21.
APA Yu, Mingrang,Zhang, Yingjie,Chen, Kun,Gao, Rui,&Zhang, Ding.(2015).Job-shop scheduling and preventive maintenance considering setup time.Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University,49([db:dc_citation_issue]),16-21.
MLA Yu, Mingrang,et al."Job-shop scheduling and preventive maintenance considering setup time".Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University 49.[db:dc_citation_issue](2015):16-21.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace