Job-shop scheduling and preventive maintenance considering setup time | |
Yu, Mingrang; Zhang, Yingjie; Chen, Kun; Gao, Rui; Zhang, Ding | |
刊名 | Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University
![]() |
2015 | |
卷号 | 49期号:[db:dc_citation_issue]页码:16-21 |
关键词 | Failure Probability Integrated plans Job shop scheduling problems Preventive maintenance (pm) Scheduling performance Scheduling theory Set-up time Shifting strategy |
ISSN号 | 0253-987X |
DOI | [db:dc_identifier_doi] |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3236153 |
专题 | 西安交通大学 |
推荐引用方式 GB/T 7714 | Yu, Mingrang,Zhang, Yingjie,Chen, Kun,et al. Job-shop scheduling and preventive maintenance considering setup time[J]. Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University,2015,49([db:dc_citation_issue]):16-21. |
APA | Yu, Mingrang,Zhang, Yingjie,Chen, Kun,Gao, Rui,&Zhang, Ding.(2015).Job-shop scheduling and preventive maintenance considering setup time.Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University,49([db:dc_citation_issue]),16-21. |
MLA | Yu, Mingrang,et al."Job-shop scheduling and preventive maintenance considering setup time".Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University 49.[db:dc_citation_issue](2015):16-21. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论