Modeling and operation performance evaluation and test of electric pitch system in wind turbine generator system | |
Li, Hui[1]; Yang, Chao[1]; Zhao, Bin[1]; Tang, Xianhu[2]; Liu, Xingzhong[2] | |
2013 | |
卷号 | 37页码:20-25+32 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3042342 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Li, Hui[1],Yang, Chao[1],Zhao, Bin[1],et al. Modeling and operation performance evaluation and test of electric pitch system in wind turbine generator system[J],2013,37:20-25+32. |
APA | Li, Hui[1],Yang, Chao[1],Zhao, Bin[1],Tang, Xianhu[2],&Liu, Xingzhong[2].(2013).Modeling and operation performance evaluation and test of electric pitch system in wind turbine generator system.,37,20-25+32. |
MLA | Li, Hui[1],et al."Modeling and operation performance evaluation and test of electric pitch system in wind turbine generator system".37(2013):20-25+32. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论