Tool requirement and pre-scheduling optimization model of the tool flow system of a digital workshop | |
Lei, Qi[1]; Zeng, Li[1]; Song, Yuchuan[1] | |
2017 | |
卷号 | 231页码:838-849 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2978491 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Lei, Qi[1],Zeng, Li[1],Song, Yuchuan[1]. Tool requirement and pre-scheduling optimization model of the tool flow system of a digital workshop[J],2017,231:838-849. |
APA | Lei, Qi[1],Zeng, Li[1],&Song, Yuchuan[1].(2017).Tool requirement and pre-scheduling optimization model of the tool flow system of a digital workshop.,231,838-849. |
MLA | Lei, Qi[1],et al."Tool requirement and pre-scheduling optimization model of the tool flow system of a digital workshop".231(2017):838-849. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论