Economic lot scheduling problem in a remanufacturing system with returns at different quality grades | |
Sun, Hong; Chen, Weida; Liu, Biyu; Chen, Xu | |
刊名 | JOURNAL OF CLEANER PRODUCTION |
2018 | |
卷号 | 170页码:559-569 |
关键词 | Acquisition management Quality grading Returns Lot scheduling Remanufacturing |
ISSN号 | 0959-6526 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2890148 |
专题 | 福州大学 |
推荐引用方式 GB/T 7714 | Sun, Hong,Chen, Weida,Liu, Biyu,et al. Economic lot scheduling problem in a remanufacturing system with returns at different quality grades[J]. JOURNAL OF CLEANER PRODUCTION,2018,170:559-569. |
APA | Sun, Hong,Chen, Weida,Liu, Biyu,&Chen, Xu.(2018).Economic lot scheduling problem in a remanufacturing system with returns at different quality grades.JOURNAL OF CLEANER PRODUCTION,170,559-569. |
MLA | Sun, Hong,et al."Economic lot scheduling problem in a remanufacturing system with returns at different quality grades".JOURNAL OF CLEANER PRODUCTION 170(2018):559-569. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论