BEAM EXTRACTION SYSTEM AND EXTERNAL BEAM LINE OF KOLKATA SUPERCONDUCTING CYCLOTRON | |
J. Debnath ; S. Paul ; M. K. Dey ; U. Bhunia ; J. Pradhan ; P. S. Chakraborty ; B. Shoor ; Md. Z. A.Naser ; C. Mallik ; G. Pal ; S. Bhattacharya ; T. K. Bhattacharya ; R. K. Bhandari | |
2010-09-10 | |
会议日期 | 2010-09-06 |
会议地点 | 兰州 |
英文摘要 | All the major components of the extraction system of the Kolkata superconducting cyclotron are installed and functional. It includes the Electrostatic deflectors, magnetic channels, M9 slit etc. Internal beam acceleration has already been done successfully and now we are on the verge of extracting and transporting the beam to the cave. The external beam transport system has been designed comprising of quadrupole magnets, steering magnets, switching magnets, beam diagnostics etc. One of the four beam lines has been installed, which extends 20 meters up to the experimental cave-1. Control and monitoring system for all these components have been developed and tested. All the beam dynamical and technical aspects of the beam extraction and beam transportation have been discussed. |
会议录 | The 19th International Conference on Cyclotrons and their Applications, CYCLOTRONS'38 |
资助机构 | IMP;Chinese Academy of Sciences |
语种 | 英语 |
URL标识 | 查看原文 |
内容类型 | 会议论文 |
源URL | [http://ir.imp.cas.cn/handle/113462/8575] |
专题 | 近代物理研究所_近代物理研究所知识存储(2010之前) |
推荐引用方式 GB/T 7714 | J. Debnath,S. Paul,M. K. Dey,et al. BEAM EXTRACTION SYSTEM AND EXTERNAL BEAM LINE OF KOLKATA SUPERCONDUCTING CYCLOTRON[C]. 见:. 兰州. 2010-09-06. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论