A hybrid particle swarm optimization for parallel machine total tardiness scheduling | |
Niu, Qun[1]; Zhou, Taijin[2]; Wang, Ling[3] | |
刊名 | INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
![]() |
2010 | |
卷号 | 49页码:723-739 |
关键词 | Parallel machine scheduling Particle swarm optimization Clonal selection algorithm Total tardiness |
ISSN号 | 0268-3768 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2310316 |
专题 | 上海大学 |
作者单位 | 1.[1]Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai Key Lab Power Stn, Shanghai, Peoples R China. 2.[2]Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai Key Lab Power Stn, Shanghai, Peoples R China. 3.[3]Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai Key Lab Power Stn, Shanghai, Peoples R China. |
推荐引用方式 GB/T 7714 | Niu, Qun[1],Zhou, Taijin[2],Wang, Ling[3]. A hybrid particle swarm optimization for parallel machine total tardiness scheduling[J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY,2010,49:723-739. |
APA | Niu, Qun[1],Zhou, Taijin[2],&Wang, Ling[3].(2010).A hybrid particle swarm optimization for parallel machine total tardiness scheduling.INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY,49,723-739. |
MLA | Niu, Qun[1],et al."A hybrid particle swarm optimization for parallel machine total tardiness scheduling".INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY 49(2010):723-739. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论