Integrated production and delivery on parallel batching machines | |
Li,Kai; Jia,Zhao-hong; Leung,Joseph Y. -T. | |
刊名 | European Journal of Operational Research |
2015 | |
卷号 | Vol.247 No.3页码:755-763 |
关键词 | NONIDENTICAL JOB SIZES TOTAL COMPLETION-TIME BURN-IN OPERATIONS PROCESSING MACHINE MINIMIZE MAKESPAN AIR-TRANSPORTATION GENETIC ALGORITHM MAXIMUM LATENESS SUPPLY CHAIN SEMICONDUCTOR |
ISSN号 | 0377-2217 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2156956 |
专题 | 安徽大学 |
作者单位 | 1.Hefei Univ Technol, Sch Management, Hefei 230009, Peoples R China 2.Minist Educ, Key Lab Proc Optimizat & Intelligent Decis Making, Hefei 230009, Peoples R China 3.Anhui Univ, Key Lab Intelligent Comp & Signal Proc, Minist Educ, Hefei 230009, Anhui, Peoples R China 4.New Jersey Inst Technol, Dept Comp Sci, Newark, NJ 07012 USA |
推荐引用方式 GB/T 7714 | Li,Kai,Jia,Zhao-hong,Leung,Joseph Y. -T.. Integrated production and delivery on parallel batching machines[J]. European Journal of Operational Research,2015,Vol.247 No.3:755-763. |
APA | Li,Kai,Jia,Zhao-hong,&Leung,Joseph Y. -T..(2015).Integrated production and delivery on parallel batching machines.European Journal of Operational Research,Vol.247 No.3,755-763. |
MLA | Li,Kai,et al."Integrated production and delivery on parallel batching machines".European Journal of Operational Research Vol.247 No.3(2015):755-763. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论