CORC  > 安徽大学
Integrated production and delivery on parallel batching machines
Li,Kai; Jia,Zhao-hong; Leung,Joseph Y. -T.
刊名European Journal of Operational Research
2015
卷号Vol.247 No.3页码:755-763
关键词NONIDENTICAL JOB SIZES TOTAL COMPLETION-TIME BURN-IN OPERATIONS PROCESSING MACHINE MINIMIZE MAKESPAN AIR-TRANSPORTATION GENETIC ALGORITHM MAXIMUM LATENESS SUPPLY CHAIN SEMICONDUCTOR
ISSN号0377-2217
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/2156956
专题安徽大学
作者单位1.Hefei Univ Technol, Sch Management, Hefei 230009, Peoples R China
2.Minist Educ, Key Lab Proc Optimizat & Intelligent Decis Making, Hefei 230009, Peoples R China
3.Anhui Univ, Key Lab Intelligent Comp & Signal Proc, Minist Educ, Hefei 230009, Anhui, Peoples R China
4.New Jersey Inst Technol, Dept Comp Sci, Newark, NJ 07012 USA
推荐引用方式
GB/T 7714
Li,Kai,Jia,Zhao-hong,Leung,Joseph Y. -T.. Integrated production and delivery on parallel batching machines[J]. European Journal of Operational Research,2015,Vol.247 No.3:755-763.
APA Li,Kai,Jia,Zhao-hong,&Leung,Joseph Y. -T..(2015).Integrated production and delivery on parallel batching machines.European Journal of Operational Research,Vol.247 No.3,755-763.
MLA Li,Kai,et al."Integrated production and delivery on parallel batching machines".European Journal of Operational Research Vol.247 No.3(2015):755-763.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace