Optimization of Water Pumping and Injection for Underground Coal Gasification in the Meiguiying Mine, China
Dong D. L.; Zhao, M. D.; Lin, G.; Zhao, W. J.; Zhang, K.; Li, N.
2016
关键词Hydrogeological model Seepage field Optimization drainage options Water injection
英文摘要The Meiguiying mine is a famous underground coal gasification (UCG) mine in China, but there has been a potential safety hazard since it began operating, that groundwater in the overlying aquifer might enter the mine and even extinguish the gasifier. A 3-D hydrogeological model was developed to explore the characteristics of the seepage field of the aquifer and determine an optimal water pumping and injection option for the UCG. The results indicate that more attention should be paid to control induced fractures of the roof due to the increasing water level of the aquifer, and that a pumping rate of 160 m(3)/day would decrease the water level to a reasonable elevation. Moreover, to maintain the groundwater table and mine safety, 120 m(3)/day was recommended as a reasonable and economical recharge (re-injection) rate in the study area.
出处Mine Water and the Environment
35
3
398-404
语种英语
ISSN号1025-9112
DOI标识10.1007/s10230-016-0389-1
内容类型SCI/SSCI论文
源URL[http://ir.igsnrr.ac.cn/handle/311030/42916]  
专题地理科学与资源研究所_历年回溯文献
推荐引用方式
GB/T 7714
Dong D. L.,Zhao, M. D.,Lin, G.,et al. Optimization of Water Pumping and Injection for Underground Coal Gasification in the Meiguiying Mine, China. 2016.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace