混合梁斜拉桥钢混结合区4-D多尺度有限元分析 | |
周萌 ; 宁晓旭 ; 聂建国 ; ZHOU Meng ; NING Xiaoxu ; NIE Jianguo | |
2016-03-30 ; 2016-03-30 | |
关键词 | 4-D 多尺度 斜拉桥 有限元分析 Saint-Venant区 失真区 asteroid periodic orbits 216 Kleopatra 433 Eros U441 U448.27 |
其他题名 | 4-D multiscale finite element analysis of the hybrid zone for cable-stayed bridges with steel-concrete hybrid girders |
中文摘要 | 结合多尺度有限元建模与4-D有限元建模思路,提出混合梁斜拉桥钢混结合区4-D多尺度有限元建模方法,以重庆永川长江大桥为工程背景建立其钢混结合区4-D多尺度有限元模型,同时建立传统精细有限元模型作为对比。比较结果表明:4-D多尺度模型不受失真区影响,结果更为准确;采用4-D多尺度有限元能够计算监测钢混结合区从施工建造至大桥服役全过程的实时力学响应及其变化,综合多个关键阶段的力学响应,获得更为安全可靠的设计依据。; Multiscale,4-D modeling is used for a finite element analysis of the hybrid zone of cable-stayed bridges with steel-concrete hybrid girders.The 4-D multiscale model of the hybrid zone is based on an actual cable-stayed bridge project in Chongqing,China.A local-elaborate model is also used for comparison.The results show that the 4-D multiscale model is not influenced by the fuzzy region.Furthermore,the 4-D multiscale model is able to simulate the full mechanical behavior of the hybrid zone from construction to service.Thus,the 4-D multiscale modeling method which accounts for all the key processes provides a more reliable approach for engineering designs of the hybrid zone for cable-stayed bridges. |
语种 | 中文 ; 中文 |
内容类型 | 期刊论文 |
源URL | [http://ir.lib.tsinghua.edu.cn/ir/item.do?handle=123456789/149140] ![]() |
专题 | 清华大学 |
推荐引用方式 GB/T 7714 | 周萌,宁晓旭,聂建国,等. 混合梁斜拉桥钢混结合区4-D多尺度有限元分析[J],2016, 2016. |
APA | 周萌,宁晓旭,聂建国,ZHOU Meng,NING Xiaoxu,&NIE Jianguo.(2016).混合梁斜拉桥钢混结合区4-D多尺度有限元分析.. |
MLA | 周萌,et al."混合梁斜拉桥钢混结合区4-D多尺度有限元分析".(2016). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论