No-wait flexible flowshop scheduling with no-idle machines | |
Wang, ZB ; Xing, WX ; Bai, FS | |
2010-05-06 ; 2010-05-06 | |
关键词 | scheduling flexible flowshop no-wait no-idle heuristics Operations Research & Management Science |
中文摘要 | This paper considers a two-stage flexible flowshop scheduling problem with no waiting time between two sequential operations of a job and no idle time between two consecutive processed jobs on machines of the second stage. We show its complexity and present a heuristic algorithm with asymptotically tight error bounds. (c) 2004 Elsevier B.V. All rights reserved. |
语种 | 英语 ; 英语 |
出版者 | ELSEVIER SCIENCE BV ; AMSTERDAM ; PO BOX 211, 1000 AE AMSTERDAM, NETHERLANDS |
内容类型 | 期刊论文 |
源URL | [http://hdl.handle.net/123456789/13895] |
专题 | 清华大学 |
推荐引用方式 GB/T 7714 | Wang, ZB,Xing, WX,Bai, FS. No-wait flexible flowshop scheduling with no-idle machines[J],2010, 2010. |
APA | Wang, ZB,Xing, WX,&Bai, FS.(2010).No-wait flexible flowshop scheduling with no-idle machines.. |
MLA | Wang, ZB,et al."No-wait flexible flowshop scheduling with no-idle machines".(2010). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论